Narva River Embankment promenaade

Client
Narva Linna Arenduse ja Ökonoomika Amet
Location
Narva
Year
2014

The river bank and the walls and slope of the bastion were reconditioned and fortified;

lighting and a video surveillance system were installed on the promenade area. Access roads,

cycle and pedestrian tracks – ca 4,100 m² with asphalt surface, ca 3,500 m² with stone pavement,

and ca 1,700 m² with gravel surface – were constructed.

The performed works included water and sewerage facilities and the construction of a viewing platform and the Swedish terrace.